TAKE IT FROM THE EXPERTS – We are pioneers in (EXTRA HIGH VOLTAGE) EHV cable installations
Power Tranz enterprises makes sure your EHV cable installations are layed perfectly, work safely and securely for decades. It is incredibly important, yet many companies neglect this and end up spending huge amounts for laying new cables when a fault happens.
If you haven’t had your cables installed perfectly or inspected recently, Power tranz enterprises is here to help. Maintaining and laying your EHV cable at low-cost ensuring zero breakdown is our priority Power Tranz Enterprises team has earned the highest ratings exceeding industry standards in EHV cable installations
full guarantee from start to finish
Our Service List
- High Voltage Cable installation 66Kv 110KV
- EHV and xlpe cable laying 230KV 400KV
- EHV cable laying by flaking
- EHV cable laying in underground ducts
- EHV cable laying in open trench
- EHV cable laying in vertical tunnels
- EHV cable laying in angled tunnels
- EHV cable laying crossing open drains with long span
- Cable jointing
- Inspections
- Quotes
- ​Repairs
- Restorations
- Site Cleanup
Featured Services
EHV CABLE LAYING IN INCLINED AND VERTICAL TUNNELS
Our team has successfully laid EHV cable in 49 degree shaft at TNEB PUSHEP Hydro project : 220KV 1X 500sq mm Aluminium conductor EHV cable was laid in 49 degree inclined cable tunnel shaft for cable corporation of India in record time. The shifting of EHV cable drums from base to hill top was appreciated even by EHV cable laying experts abroad.
EHV CABLE LAYING IN HYDRO ELECTRIC POWER STATIONS
Our team has the experience of laying cable EHV cable in Jammu & Kashmir Uri-ii Hydro Electric Power Station. This project comprised of laying 400 KV cable in very tough environment and laid x1000 sq.mm XLPE cable in 60 degree inclined cable shaft in Tunnel size of 4 mtr diameter. The cable feeder was success fully energised.
EHV CABLE LAYING UNDERWATER IN TURBULENT SEA
Our team has the experience of laying EHV cable under water one of the unique projects that our team member was involved in was an underwater installation for M/s Vivekananda Rock memorial at Kanyakumari, Tamil nadu. This project comprised of laying 700 meter 3.5x 95 sq mm copper submarine cable laid on sea bed at a depth of 6 meters. Special RCC boulders were designed to hold cable under water to maintain the same alignment even during rough weather and water turbulence. The project was commissioned in 1988